Dock Area Shoreline Protection
The Town of Niagara-on-the-Lake has engaged Shoreplan Engineering to design shoreline protection improvements along the park and shoreline between 25 Delater Street and 85 River Beach Road. The park shoreline is eroding and the historic culvert is vulnerable to wave action. The intention of this plan is to improve the park shoreline protection while maintaining the existing headland bay system and trees in the park as much as possible.
Shoreplan Engineering has submitted the final design, please share your thoughts below.
Notice: Temporary Park Closure - Shoreline Protection Installation Please see the Document library for more information on the closure.
The Town of Niagara-on-the-Lake has engaged Shoreplan Engineering to design shoreline protection improvements along the park and shoreline between 25 Delater Street and 85 River Beach Road. The park shoreline is eroding and the historic culvert is vulnerable to wave action. The intention of this plan is to improve the park shoreline protection while maintaining the existing headland bay system and trees in the park as much as possible.
Shoreplan Engineering has submitted the final design, please share your thoughts below.
Notice: Temporary Park Closure - Shoreline Protection Installation Please see the Document library for more information on the closure.
-
Share on Facebook Share on Twitter Share on Linkedin Email this link
Share your thoughts!
over 5 years agoCLOSED: This brainstormer has concluded.Three shoreline protection alternatives were considered, the preferred shoreline protection was Alternative 3 with Headland/Beach system. This alternative includes a cobble beach at the east end of the park, armour stone walls surrounding historical outfall, and a boulder berm along the west end of park.
Please share your thoughts!
Life Cycle
-
Public Information Meeting - November 27
Dock Area Shoreline Protection has finished this stageThe Town hosted a public information meeting to review and comment on proposed designs.
-
Public Input - Extended
Dock Area Shoreline Protection has finished this stageThe Town has extended the deadline for comments on the selected designs for the shoreline protection in the Dock Area.
-
Peer Review - end of May
Dock Area Shoreline Protection has finished this stageShoreplan Engineering will submit the proposed design for a peer review by a qualified Engineering firm.
-
Public Information Meeting - Thursday, June 7, 2018
Dock Area Shoreline Protection has finished this stageThe Town of Niagara-on-the-Lake has a final design for the shoreline protection in the Dock Area. We are asking residents to come and give us some feedback on design. Shoreplan Engineering will have the design and we also have information from the peer review for presentation.
Please join us at our Open House
Date: Thursday June 7, 2018
Time: 6:30 – 8:30 pm
Place: Mori Room, Community Centre
-
November - December 2018
Dock Area Shoreline Protection has finished this stageConstruction of the approved design elements within the approved capital budget.
-
Temporary Park Closure - Shoreline Protection Installation
Dock Area Shoreline Protection is currently at this stageThe Town of Niagara-on-the-Lake has engaged a contractor, who will be installing shoreline protection. The contractor will be working on site, commencing Wednesday January 23, 2019. It is anticipated they will be finished in approximately two (2) weeks (weather dependant). The area will be reopened once the work is completed.